Submittal log and register
A submittal log (or submittal register) lists every submittal a project requires, by spec section, with due dates and status. See how to build one and keep it current.
What a submittal log is
A submittal log, also called a submittal register or submittal schedule, lists every submittal the specifications require: spec section, description, type, responsible party, required date, review time and current status. It is the contractor's master checklist for the project.
How to build it
Go through each specification section and pull every paragraph that says submit, provide, furnish or include product data, shop drawings, samples or certificates. Record the section number and paragraph for each so a reviewer can trace it back. SUBNEXUS reads the awarded spec book and builds this log for the whole project.
What to track
- Spec section and paragraph reference
- Submittal type and description
- Who prepares it and who reviews it
- Required-by date and review duration
- Status: not started, in progress, submitted, approved, revise and resubmit
Keep it connected to the work
A log that lives apart from the packages goes stale. When each log line opens its requirement list, evidence and reviewer comments, the log becomes the project's working record.
Quick answers
What is a submittal register?
Another name for the submittal log: the project's list of required submittals with status.
Is there a submittal log template?
A spreadsheet works for small jobs. A tool that generates the log from the spec book avoids missed items.